- Thread starter
- #1,321
onanysunday
Well-known member
- May 7, 2021
- 3,398
- 3,171
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
We are very close. Probably a hard week for both of us so another 100 hours maybe. Although that is now getting spread out among other things. Need to do an order from Fragola for my PTFE line fittings. Brake lines need made. Airbag lines need run and hooked up. There is still some wiring to complete. Trans and engine cooler lines. Hook up the intercooler tubes. Those bottom door panels I cut and installed from todays pics have a gap so I will need to make some sort of spacer and then drill and tap for more screws at the bottom.Looking almost complete. When is this bad boy firing up for the first time?
Warranty now completely voided. That was fun trying to drill straight through to the other hole. Ended up making a second set of plates trying to get just a little bit more. Also notched the floor a little bit. Wasn't able to lower the pedal very much but I was able to change the angle quite a bit so now the plunger in the master goes very close to the 1.4 in Wilwood said they want. So now I need a return spring, brake light switch, and probably some sort of footrest box.
Brake light switch mount. Just need to plug in the wires.
Yes?Aren't you running an auto trans?
Yes?