chEFFs Dream Home Build

Monday 9-20-21 the framers showed up. Chalked out all the walls. Builder kept telling me "Moment of truth" Are the plumbing pipes going to be in the walls? Turns out they fit perfect. The slab was out of square about an inch in one corner by the garage doors. Had around eight guys show up. They're quite the talented group. This is the exciting time of the build. Go Vertical. Peace

Frame 9-20-21 (3).JPG

Frame 9-20-21 (4).JPG

Frame 9-20-21 (5).JPG

Frame 9-20-21 (6).JPG

Frame 9-20-21 (2).JPG

Frame 9-20-21 (1).JPG

 
Looking good so they didn’t start till Monday. You could have stayed  :rofl:

 
First Change Order. My view sitting at the bar facing West. NOOO! Can't be staring at a wall. 6'x6' window has been ordered. Peace

IMG_3011.JPG

 
You can see on the left the widow has been framed. Peace

IMG_3026.JPG

 
The back patio will be all glass. Bought those big all glass slider doors. Didn't budget for them but oh well. Peace

IMG_3029.JPG

 
Guest Quarters #1. Peace

IMG_3023.JPG

 
Guest Quarters #2. On the R-Hand Side of the front door. Peace

IMG_3022.JPG

 
Front Door view all the way thru the back. Peace

Front Door 1.jpg

 
YEP. Can't stare at a wall while sitting at the Bar. DAMN......Need Help Robert L. Peace

Change Order 1.jpg

 
Only if the whole process went as fast as the framing.

 

Attachments

  • 32B743F4-40E2-4906-A99A-AC0FE6DD9C7A.jpeg
    32B743F4-40E2-4906-A99A-AC0FE6DD9C7A.jpeg
    154.1 KB · Views: 0
Back
Top