- Thread starter
- #121
ChEFF
Forum Moderator
- May 1, 2021
- 14,680
- 8,810
Saturday Morning First thing. Arrival of the pump truck! It's amazing how these concrete companies have it down to a science. So thankful I'm not doing that work. Peace
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
Lumber prices have been falling quite a bit lately. Hopefully steel follows suit soonLumber Package Quote came in today. We guesstimated high @ $88,000 with the Construction loan.
Total $86,500. Whew.........I was worried it would be enormously higher than the $88k. Time to order the lumber.
Peace
I wanna see your big wood going up! Wait, did that sound bad
Tell me about it. Garage doors have gone up 70% in just over a year, and right now I was told it’s a 14-15 week lead time to get doors. Both brands I was considering (Clopay or Amarr) both the same deal. So I put my deposit down and wait, should be a great Christmas gift!Atl east lumber has dropped almost 60% garage doors are thru the roof though
Try Martin I can get them pretty quick but I’m pretty close to the factory in salt lake we are the same for amarr
We have all told him many times, He just says that is the way they do it in Texas, after that there is no telling him anything, just like when we told him Strap on Tuesday wasn't a thing any place but in Texas. His answer is always the same "Texans don't need to be told how to do anything or what day is Tuesday, they already know."So........You're gonna do it like that huh?
Looks good, except for the obvious.....
We have all told him many times, He just says that is the way they do it in Texas, after that there is no telling him anything, just like when we told him Strap on Tuesday wasn't a thing any place but in Texas. His answer is always the same "Texans don't need to be told how to do anything or what day is Tuesday, they already know."