[SIZE=12pt]At the recommendation of a couple of my Glamis friends who moved from CA to Havasu; we drove out from Seal Beach to check it out. [/SIZE] It just felt like we were back in the OC in the 70’s.
[SIZE=12pt]Our friend drove us all around looking at housing and properties. [/SIZE]None of the homes were what we wanted but we found a piece of land that day and bought it.
[SIZE=12pt]That was 5 years ago. [/SIZE]For all the reasons listed already, we love it here. We got a pontoon boat, Of course we have the Tatum and we ordered a “to be seen to believe” RG. BTW Robbie says Havasu will be the west coast headquarters.
[SIZE=12pt]We love the small-town feel. There are no streetlights or sidewalks, and the speed limit is 35mph everywhere. [/SIZE]Lots of good food except Sushi. Miles and miles of trails, some rock crawling, and plenty of open shooting. I swear there is chit going on every weekend. Car gatherings Thursday nights on main street. Run to the Sun, Desert storm, Super Cats. UTV championships, Jet ski worlds and just down in Parker drag boats and circle/ ski races.
[SIZE=12pt] [/SIZE]
[SIZE=12pt]So from the land purchase, [/SIZE]2 ½ years of design and plan check we finally got started on the build. I am doing it as Owner Builder.
[SIZE=12pt] As stated already, everyone including contractors work on Havasu time. [/SIZE]After site prep and retaining walls built, I had my first column footing poured. That took 6 months to complete the 5X5X13 footing with a well-known and very reputable contractor. We were still in CA and discovered you could never count on a firm commitment to weekly work plan. So, we sold the CA home (for stupid money) and bought a home in Havasu to live in while building our dream home. Shortly after we got here, from another group of Glamis peeps we find out my buddies’ wife had an uncle who was a contractor in Kingman. He turned me on to a guy (Sal) from CA who had a civil crew. Wow did they come in and chit and git-it. In the first month they did 2 more 5X5X13 footings and all the lower garage column footings. Next Sal got me some steel erectors out of CA. They put up 62 tons of steel in 30 days with 3 guys. All these guys are cash only and I provided the hotel rooms.
[SIZE=12pt]Today I’m 95% done with framing and now I’m ready to start the easy stuff. [/SIZE]Electricians, Plumbing, Stucco, Roofing, Cabinets & Counters, Drywall, flooring, and xxxx and xxxx and xxxx. All local guys.
[SIZE=12pt]I hope I live long enough to see it done.[/SIZE]
DL