Finished up my residential fridge install, Finished up my inverter upgrade. Testing the whole system. Left everything running on the inverter, seeing how long it'll go before the auto Gen start kicks on. So far everything is working perfectly. I'll add some solar soon, and extend how long it'll go before the Gen kicks on. As of right now, it'll go 24 hrs, with the fridge on, being opened multiple times, for minutes at a time, TV and DVD player running, and outside lights on. Not bad. Gen fires up, runs for 2 hrs, and the cycle repeats...